World's Toughest Fixes Season 1 Episode 9

Ep 9. Interstate Bridge

  • TV-PG
  • June 18, 2009
  • 50 min

World's Toughest Fixes is a reality TV show that follows host Sean Riley as he sets out to explore some of the most challenging engineering tasks in the world. Each episode features a different project, and the challenges that come with it. In this episode, season 1 episode 9 titled "Interstate Bridge," Sean takes viewers behind the scenes of a major bridge renovation project.

The episode opens with a shot of the Interstate Bridge in Portland, Oregon. This busy bridge spans the Columbia River, connecting Oregon and Washington. It's a vital transportation link, with millions of vehicles crossing it every year. But it's also old and in dire need of maintenance. The Oregon Department of Transportation has launched a major renovation project, and Sean is here to get a closer look at what's involved.

Sean starts out by meeting with the project manager, who explains some of the challenges they face. The bridge is more than 100 years old, and parts of it are in serious disrepair. There are also strict regulations in place to protect the environment, since the bridge is over a major waterway. To top it off, the renovation work has to be done while keeping traffic flowing – this is one of the busiest highways in the western United States, after all.

Sean visits one of the most challenging areas of the bridge – the truss span. This is the part of the bridge that rises up to allow tall ships to pass underneath. To get a close look at it, Sean has to climb up to the top of the truss, hundreds of feet above the water. From there, he can see the full scope of the project. There are dozens of workers down below, some of them suspended from cranes or working on scaffolding.

The renovation work involves repairing and replacing the truss's massive steel components. Some of these pieces weigh tens of thousands of pounds, and have to be lifted into place with specially-designed cranes. Sean gets to witness one of these crane lifts up close, watching as workers guide a massive steel beam into place. It's a delicate operation, and the crew has to coordinate their movements with the crane operator to make sure everything goes smoothly.

Another challenge the crew faces is the need to avoid disrupting traffic. The bridge has to remain open during the renovation work, which means the crew has to work around it. This involves building temporary work platforms beneath the bridge, so that workers can access the truss without blocking the lanes of traffic. Sean gets a close look at these platforms, which are made of steel beams and mesh netting.

Throughout the episode, Sean talks to the workers, including welders, crane operators, and project managers. They all share stories about the unique challenges they face on this project. For example, the welders have to work in confined spaces, using special breathing gear to keep them safe from the fumes. The crane operators talk about the skill required to maneuver the massive machines, even in high winds. And the project managers discuss the logistics of coordinating the work across dozens of different tasks.

At the end of the episode, Sean reflects on the scale of the project. Despite the challenges, the crew is making steady progress, and the renovation is on track to be completed within the timeline and budget set by the state. The repaired bridge will provide a safer and more reliable connection between Oregon and Washington for years to come. It's a testament to the skill and dedication of the workers who are tackling this "toughest fix."

Description
Watch World's Toughest Fixes - Interstate Bridge (s1 e9) Online - Watch online anytime: Buy, Rent
World's Toughest Fixes, Season 1 Episode 9, is available to watch and stream on National Geographic. You can also buy, rent World's Toughest Fixes on demand at Amazon, Vudu, Google Play, Apple TV online.
  • First Aired
    June 18, 2009
  • Content Rating
    TV-PG
  • Runtime
    50 min
  • Language
    English